To the central content area

The Inspection and Certification Third Party on Due Recycled Waste(Non-Plastic Waste Containers)

Absrtact
The project period was from Jan 01, 2013 to Dec 31, 2014. According to the results of auditing and certification from Jan 01, 2013 to July 31, 2014, the main tasks included the auditing processes of collection quantity, recycling quantity, operational processes, environment, and accounting. The total certified recycled quantity of non-plastic waste containers was 609,537,188 kilograms and the total certified disposal quantity was 609,389,991 kilograms. For the results of the auditing training, every new inspector was required to complete at least 40-hours training and related examinations. The project also conducted 25 vocational trainings hold monthly. Besides, the professional trainings were completed on 16~17 Mar, 2013 and 28 Feb~1 Mar, 2014. According to the results of operational processes auditing for recycling facilities, the major abnormal events were violations of the collection and storage regulation which contributed 73.24% of the total. For the results of environmental safety and health auditing for recycling facilities, the abnormal events were water discharging problems in facility and storage area which contributed the highest rate. The major abnormal events included the uncertified wastes in the certified area, the closed-circuit television system malfunction, the closed-circuit television data lost, and the other major abnormal event. In the other hand, there were 220 minor abnormal events of certification equipments malfunctions which contributed 93.62% of the project’s total minor abnormal events. There was no abnormal event regarding to the accounting auditing for disposal industry. During the project period, foundation of Taiwan industry service completed 29 qualification data inspections for disposal entities, 18 qualification data inspections for collection entities, and 2 field inspection for disposal entity. Also 20 visiting trips to collection entities had been completed. The container checking work had been finished and the checked containers includes waste iron containers, waste glass containers, and waste pesticides containers.
Keyword
Inspection and certification quantity; Operation process auditing; Environmental safety and health auditing
Open
top